Nedstack offers a comprehensive portfolio of PEM fuel cell power systems for mission critical and long-life stationary applications. Our solutions are optimized for meeting the lowest levelized cost of power and are secured by advanced safety concepts.
Stationary PemGen Portfolio
Nedstack has developed and built:
- Worlds longest running PEM Power Plant (>65k hours),
- Worlds First MWe sized PEM Power Plant (2011) and
- Worlds largest PEM Power Plant (2 MWe @ EoL).
